OLA Consulting Engineers
info@olace.com
914.747.2800
646.849.4110

A better shopping experience means drawing in both local consumers and tourists to your retail facility. Our MEP engineers and energy professionals design reliable systems to efficiently and effectively operate your facility.

Cross County Shopping Center

YONKERS, NY

SERVICES PROVIDED

MEP Engineering, Fire Protection Engineering

PROJECT FEATURES

Complete renovation repositioned the 1 million square foot outdoor shopping center as one of the most successful retail developments in the region.

ARCHITECT

505 Design & Urbitran/AECOM

As part of the $150 million redevelopment, OLA designed new site electric distribution, new site natural gas distribution, gas and electric metering in new meter rooms, new backflow prevention for fire and water services to each of the buildings, sanitary sewer and storm water pump stations for forced mains, site lighting, and other utility upgrades.

Brooklyn Junction Mall

BROOKLYN, NY

SERVICES PROVIDED

MEP Engineering, Fire Protection Engineering

PROJECT FEATURES

260,000 square foot retail center on three levels with a 500 car parking deck.

ARCHITECT

Cooper Carry

A dramatic glazed atrium fronting Brooklyn’s main shopping artery provides access and visibility to upper floors. The site sits at the junction of three communities, the terminal point of two subway lines, the crossroads of six public bus lines and at the deflection point of the city grid. A partnership of the city of New York, the borough of Brooklyn and Triangle Equities, the Junction spans the LI Railroad and NYC Transit subway.

CURRY SUBARU HYUNDAI

CORTLANDT MANOR, NY

SERVICES PROVIDED

MEP Engineering, Energy Modeling, Commissioning

PROJECT FEATURES

30,000 square foot LEED NC Certified new dealership.

ARCHITECT

Architectural Visions

Sustainable features include Solatube ceiling skylights, daylight sensing lighting controls, energy efficient lighting and HVAC systems, including heat recovery. Energy conversation features combine to achieve a 23% energy use reduction as compared to the LEED baseline. Water conservation features in the plumbing design for the building allowed for a 30% water usage savings.

LONGCHAMP

NEW YORK, NY

SERVICES PROVIDED

MEP Engineering, Fire Protection Engineering

PROJECT FEATURES

Complete renovation of an existing two story building with a new addition of a third floor level incorporating showroom, offices, and roof garden.

ARCHITECT

Atmosphere Design Group & Heatherwick Studio

Longchamp’s international design team and signature rolled steel landscape stair have been featured in Architectural Digest, and have won the AIA Top Honor Award, Design Week’s Best Retail Interior Award, and several other accolades. OLA designed new MEP and fire protection systems, seamlessly into the complicated building arrangement and ceiling details.

Designed by Jill Singer Graphics